Estimating IT Work: Straight Answers to the Questions We Get Most

Estimating IT Work: Straight Answers to the Questions We Get Most

Readers of this blog often write in with the same puzzle: the work was planned, the plan was sensible, and yet the clock said otherwise. This post answers the most frequent questions about estimating operations and IT work, in short and direct form. Everything here rests on one idea. Every estimate stays a guess until it meets the facts of the finished job, and that meeting is what lets you correct the next guess by a number you have measured instead of a feeling.

Why do my estimates keep coming in low?

Because you picture the smooth path. When you guess, you imagine the task going as intended, with no waiting, no surprises and no rework. Reality brings interruptions, access problems and changes of mind. This is such a common pattern that it has a name, optimism bias, and it affects careful people as much as careless ones.

The practical response is not to try harder at guessing. It is to measure the size of your bias and use it. If your tasks typically take one and a half times your guess, plan with that multiplier and stop treating each overrun as a one-off.

What exactly should I record?

Four things for each task: a short description, your guess in hours, the actual hours when finished, and a note if the difference was large. The guess must be written before work begins. A fifth item, the ratio of actual to guess, can be calculated later. Anything beyond this is optional and tends to kill the habit.

Which tasks are worth logging?

Anything you would have guessed at thirty minutes or more. Smaller chores add overhead without much signal; lump them into a daily line called “small stuff” and give that line its own guess and actual. Include work that went well. A history made only of overruns would make you look slower than you are and would hide the types of task you handle most smoothly.

How many entries do I need before the numbers mean anything?

Five give a hunch, ten allow a working rule for one type of task, and thirty let you trust a median. If a task type is rare, borrow the ratio from the nearest similar work and revise once you have your own samples. State the sample size beside every factor so nobody mistakes a hint for a fact.

Should I use the average ratio or something else?

Prefer the median, the middle value when you sort your ratios. A single incident that ate a week will drag an average upward for months, while the median barely moves. For high-stakes dates, look at the upper part of the range, say the seventy-fifth percentile, and plan against that.

Do different kinds of work need different factors?

Yes, and this is where most of the value lives. Routine, templated work often sits near 1. Work involving other teams, approvals or unfamiliar tooling often sits at 2 or more. For incident-related tasks the variance is wider still, because the cause is unknown at the start. A pair of earlier posts on this blog look at the operational side of those tasks: one about handling incidents more quickly with automated assistance and one offering a step-by-step plan for operations and reliability teams. Both describe task types you could log separately.

Won’t people pad their guesses if they know they are being tracked?

They will if the numbers are used to judge individuals. Keep the log about tasks and task types, never about people, and keep it out of performance conversations. Share the corrected plan with the team, not a league table of ratios. If padding creeps in anyway, you will see it as ratios falling well below 1, and the response is to talk about the purpose of the record, not to punish the writers.

What if scope changes halfway through?

Record a revised guess at the moment scope changes, and keep the original beside it. That way the ratio against the original still measures your habit, and the ratio against the revision measures how well you re-sized. Never overwrite the first guess; it is the only honest evidence of how you estimate when starting cold.

How do I deal with waiting time?

Log it separately. Hours spent blocked on access, review or another team are not effort, and treating them as such makes you look slow when you were simply queued. When a task type has a large waiting share, the fix is often process, not estimation: raise the request earlier, or ask for access in bulk.

What does a corrected plan look like in practice?

Take a weekly list of four jobs: a patch window guessed at three hours, a monitoring clean-up at four, a handover document at two, and a vendor call follow-up at one. If your medians are 1.5 for patching, 1.8 for clean-up work, 1.2 for documents and 1.0 for follow-ups, the corrected hours are 4.5, 7.2, 2.4 and 1.0, about 15 against a raw 10. The plan now says plainly that the week holds about fifteen hours of work, and you can decide what to move before Monday starts, not on Thursday evening.

What if I work in a team that does not log anything?

Start alone, and keep it private. A personal log needs no permission and no tooling. After a month, mention a single finding in a planning meeting, for example, “my access-related tasks ran at three times the guess, so I raise those first”. Colleagues often ask how you know, and the conversation starts without anyone being told to change. Teams tend to adopt a habit once someone demonstrates that it saves effort.

How often should I review the factors?

Every quarter is a sensible rhythm. Skills and tools change, so factors should drift toward 1 over time. If a factor has not moved in a year, either the work is steady or the log has quietly stopped being kept. Check which, and ask the team.

Is there a ratio I should aim for?

Aim for stable, not perfect. A task type whose ratio sits reliably around 1.2 is easier to plan around than one that averages 1.0 but swings between 0.5 and 2. Predictability is the prize, because it lets you commit to dates without holding your breath. Spread matters as much as the middle, so glance at the lowest and highest values in each group whenever you review.

It also helps to remember that a ratio well below 1 is a signal too. It may mean you are padding, or that a task has become so routine that it could be automated or batched with something else.

Where does this site fit in?

This blog belongs to the website of Cotocus Foundation, which describes itself as a nonprofit working through technology, innovation and education. Alongside the blog, the site has sections for programs, research, community and stories. The posts here take a practical, plain approach, and this one is no exception: nothing above depends on anything beyond a pen and a page.

Can I start with something small?

Yes, and you should. Choose one type of task, maybe routine maintenance or a weekly report, and log the next ten of them. Write the guess first, record the actual, and work out the ratio. By the tenth entry you will know whether you lean optimistic for that task, and by how much. Then apply the factor to the eleventh and see what happens.

If the plan then lands close to reality, widen the habit to a second task type. If not, look at the biggest miss, write down what caused it, and adjust. Either way, you will know more about your own work than you did last week, and that is the whole aim of the exercise.